RACH MIEU BRIDGE TOLL COLLECTION STATION (CHAU THANH, BEN TRE)

§   RACH MIEU BRIDGE TOLL COLLECTION STATION (CHAU THANH, BEN TRE)

 

Process, technology: A stop (bar code), no stop (number plate Identification)

Installation place: Chau Thanh District, Ben Tre Province

Owner: BOT Rach Mieu Bridge Co.

Equipment installation time: 2008

Operating systems date: 2008

Scale: 6 + 4 = 10 lanes

Current status: Active well